MARTA is advancing its commitment to enhancing the existing system and improving transit service and its facilities as part of the “
MARTA 2040” program. Over the next two decades, MARTA will increase connectivity, accessibility, and mobility across the region by performing several projects of varying sizes and impacts.
As part of
MARTA 2040 and its Capital Improvement Program, MARTA is excited to begin repaving parking lots at five stations in 2023. Lots will be repaved in phases to reduce impacts to parking availability. While we upgrade the lots, your experience with customer parking, pedestrian access, and
potentially bus access may be affected at the following stations. At this time, we
expect the number of spaces at each station to meet the current needs of our
customers throughout the projects. All stations will have parking
available during repaving.
Parking Lot Repaving Program Fact Sheet
Parking Lot Repaving Program Fact Sheet (Spanish Version)
Please check this page often, as more details will be provided once available. You
may also check the Key Station Parking page for up-to-date information
on parking lot status.
The parking lots planned for repaving are:
Red/Gold North Stations
Red/Gold South Line
Station-Specific Details
Brookhaven
Station
- Beginning April 7, 2023, access to a portion of Brookhaven station’s East Parking lot will be limited to allow for a laydown/staging area for (i) the repaving contractor as they prepare to repave the lots and (ii) for the construction of the City of
Brookhaven City Hall. The North Entrance along Apple Valley will be closed to patrons. Patrons will utilize the south entrance on Apple Valley to access the lot on the station’s west side. Repaving will begin shortly thereafter and will continue for several months and the limited access will not affect any ADA
parking at this time; however, ADA spots may be temporarily relocated as the project moves forward. The Covid Testing Site will not be affected. Patrons should watch for directional signage, as access points and parking areas will shift as the work progresses.
Front Lots (Peachtree Rd):
- Peachtree Driveway Entrance will remain open. Dresden Entrance will be closed.
- All services including ADA Parking, Taxi, Kiss & Ride, and Zip Car Service will be available in the Long-Term Parking Lot.
Back Lots (Apple Valley Rd & Dresden Dr):
- Parking Driveway along Apple Valley Drive will remain open.
- Parking will be available near the tunnel.
- Viral Solution Testing will continue at the station and will be located in the South Lot.
Chamblee
Station
- Demolition and repaving is scheduled to start in Spring 2023 and will take several months to complete. During the project, customers will have ample parking to meet their needs. Please watch for signs directing parking and pedestrian traffic.
Main Lots (New Peachtree &
Chamblee Tucker Rds):
- New Peachtree Road entrance will remain open.
- Chamblee-Tucker driveway will be closed.
- Interactive College of Technology Parking will be available via the New Peachtree Road entrance.
- ADA Parking will continue at both sides of the station during Phase One.
West Lots (Peachtree Rd):
- All Peachtree Road Entrances will be open and unaffected.
West
End Station
Phasing dates are currently being finalized. Bus service may be affected at this station. Please check back at this site for updates.
Oakland
City Station
- Demolition and repaving is currently in progress and is expected to be completed by late Summer. During the project, customers will have ample parking to meet their needs. Please watch for signs directing parking and pedestrian traffic.
East
Point Station
Phasing dates are currently being finalized. Bus service will not be affected at this station. Please check back at this site for updates.
College
Park Station
College Park Station’s west lot (E. Main St.) remains closed for repaving. Customers should continue to park in the east parking lot on the (Lee St.) side of the station. Starting October 10, 2023, a portion of the Lee St. lot will begin construction and the E. Main St., lot will reopen for patron parking.
Starting October 5, 2023 a portion of College Park's east parking lot (Lee St.) will be closed for repaving. Please look for directional signage to the nearest available parking lot and check back here for updates.
Inman
Park/Reynoldstown Station
Phasing dates are currently being finalized. Bus service will be affected at this station. Please check back at this site for updates.
Edgewood/Candler
Park Station
Phasing dates are currently being finalized. Bus service will not be affected at this station. Please check back at this site for updates.
East
Lake Station
Phasing dates are currently being finalized. Bus service and Kiss & Ride Service will be affected at this station. Please check back at this site for updates.
Kensington
Station
Phasing dates are currently being finalized. Bus service will not be affected at this station. Please check back at this site for updates.
Ashby
Station
Phasing dates are currently being finalized. Bus service and Kiss & Ride Service will not be affected at this station. Please check back at this site for updates.
Follow Us
Follow MARTA’s social media channels to receive updates.
Thank you for your continued support of MARTA and we look forward to bringing you an improved transit system.